Project Name: Niagara Falls Squad Ops B807 Renovation
Project Location: Niagara Falls, NY
Project Owner: U.S. Corp of Engineers–Louisville
Contract Value: $5,091,545.00
Completed: November 2014
The impetus for this contract was a mission change to the Niagara Falls Air Reserve Station involving a change to a different aircraft. The goal of the HW Pence – CDFL Design/Build Team was to convert the existing Squad Ops Facility (Bldg. 807) to a like-new facility that meets the functional needs of the 914th Airlift Wing.
Building 807 (16,913 SF) was constructed in the early 1990’s. A command post of approximately 1,300 SF was added later. Our Design/Build Team reconfigured Building 807 to support Training, Offices, Intel, and Mission Planning functions. A 1,700 SF addition was designed and constructed to increase training and office capacity. The existing 1,300 SF command post was protected during all phases of demolition and construction.
“Pence has performed well during this contact. The increased their efforts/management when necessary to overcome problems encountered. I would absolutely award additional work to Pence without reservation.”
-D/8 Niagara Falls Squad Ops Building 807 Renovation Niagara Falls, NY